GeoVerify: EUDR deforestation check, Riau
Forest on the EUDR cut-off date (31 Dec 2020), tree cover loss since then, and the legal status of the land.
Layers
- Deforestation after 2020 (loss inside the 2020 forest)
- Moratorium on new permits (PIPPIB 2026-I)
- Forest estate Riau (kawasan hutan)
- Regencies and cities
- Loss 2021-2025 (after cut-off)
- Loss 2001-2020 (before cut-off)
- Moratorium area PIPPIB 2026-I
- Peat hydrological units (KHG)
- Kawasan Hutan (June 2026)
- Forest on 31 Dec 2020
- Tree canopy cover 2000
GeoMatra